Communicate with Supplier? Supplier
Annie Ms. Annie
What can I do for you?
Contact Supplier

Ningbo Nide Mechanical Equipment Co., Ltd.

Products

Home > Products > Stator Manufacturing Machine > Stator Powder Coating Machine > Stator coil insulation treatment powder coating machine

Stator coil insulation treatment powder coating machine
Stator coil insulation treatment powder coating machine
Stator coil insulation treatment powder coating machine
Stator coil insulation treatment powder coating machine

Stator coil insulation treatment powder coating machine

Payment Type: L/C,T/T
Incoterm: FOB,CFR,CIF
Min. Order: 1 Set/Sets
Delivery Time: 45 Days
Download:

Basic Info

    Model No.: ND-XQTF-10

    Machine Size: Middle Type

    Customized Service: Available

    Certificate: CCC

    After-sales Service: Overseas Service Center Available

    Machine Color: RAL9010 Or As Per Customer Requirement

    Name: Stator Powder Coating Machine

    Function: Stator Coil Powder Coating

Additional Info

    Packaging: wooden case package

    Productivity: 100sets

    Brand: Nide

    Transportation: Ocean,Land

    Place of Origin: China

    Supply Ability: 100 sets per year

    Certificate: ISO

Product Description

Full automatic Stator coil insulation treatment powder coating machine


This armature Stator Powder Coating Machine is suitbale for stator coil insertion. The Stator Coil Powder Coating Machine is eay to operate; the powder process is done by machine automatically.


Design and produce principle

No

Name

Design parameter

Remark

1

Workpiece name

motor stator coil


2

Workpiece material

Enameled wire


3

Workpiece Dimension

Stator lamination diameter<Φ95mm
stator lamination thickness(include coil height)<100mmMax


4

Workpiece weight

<3 Kg Max/pc


5

Output

120~180pcs/h

The output is working ability;

6

Working hours


Decide by customer


Machine compositions;
XQTF-10 Coil powder coating machine:1set ,including:


1.1.Machine mainframe 1set

Outline dimension:L1253×W1300(include powder cleaning room 500mm) xH2100mm

The room body manufactured by 1.2mm A3 cold rolled plate.

1.2 .DC electrical heating device: 1set
Heating power(0~10KW,clearance working way)adjustable,it can set heating time.

1.3 .Pneumatic rise and decline device 1 set

1.4 .Fluidized bed coating device: 1set

All PVC plate manufacture, with detachable air chamber and micro-hole sheet.

1.5 .Powder vibration device 1set
1.6. First step pulse recycling in the back 1set, with 2pcs filter element and pulse auto back flushingfunction, it can clean the powder in the filter element automatically without turning off the machine, with 1 set powder-blowing gun.
1.7. The coating room doorway install photo-electricity protection(raster)device,this keep the user saver when operating.

1.8 The machine has count function.
(1). Powder secondary recycling machine(outline dimension L830×W830×H1700mm): 1 set
(2). Use 25 type pulse back flushing filter element way recycling machine, motor power 2.2KW.


Working process:

(1). Load the coil (1pc) to the sling fitting and insert each wire head(heated) into the connection groove,compact inching cylinder.

(2). Turn on the switch (go up and down, heating, coating etc controlled by time relay to work automatically)

(3). After finish coating (the powder adhere to the stator coil and through melting and leveling preliminary, there's a little powder in the inside and outside of the stator lamination, but not melt, it can cleancompletely by preliminary air blowing and subsequent cleaning).Take it down and transmit toanother person,clean the inside and outside of the stator with air blowing gun in the powder cleaning entrance,then put it on the shelf (prepared by customer) for natural cooling → put into oven together for baking[(prepared by customer, the bake requirement of the powder in the oven is the oven temperature rise to the needed temperature for curing powder(this depend on the enameled wire heat-resisting temperature and powder curing requirement), keep hot insulation for over 40 minutes).

Machine energy consumption index

No

Machine name

Quantity

Electrical(KW)

compressed air (m3/min)

1

Powder coating machine

1

10

0.3

2

Powder recycling machine

1

2.2

0.1

Total


8.2

(Average~KW)

0.4


Electric requirement:

(1). Electricity: 380V±10%, 50HZ. Electricity supply way: three phase four wire system.

(2). Compressed air: 0.6Mpa containing oil:≤0.1ppm containing water: ≤ 1.3g/m3


Stator-Coil-Powder-Coating-Machine100Stator-Coil-Powder-Coating-Machine101Stator-Coil-Powder-Coating-Machine102


3


Looking for ideal Stator Coil Powder Coating Machine Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Stator Coil Insulation Machine are quality guaranteed. We are China Origin Factory of Stator Powder Coating Machine. If you have any question, please feel free to contact us.

Product Categories : Stator Manufacturing Machine > Stator Powder Coating Machine

Send Inquiry

Annie

Ms. Annie

Email:

marketing2@nide-group.com

Send Inquiry

Tel:86-574-87295639

Fax:86-574-87295637

Mobile Phone:+8613738869026

Email:marketing2@nide-group.com

Address:14-5, East Kemao Center, No.100 Xiangyun Road, Hi-tech District, Ningbo, Zhejiang